Challenges - Botswana
 

North South Pipeline Carrier 2 - Botswana

Project Background / Scope of Work


Botswana nsc

The town of Palapye is located on the main highway from Gaborone to Francistown, and is approx. 270km. from Gaborone. The road is surfaced along the entire main road and is therefore easily accessible. From Palapye, the route of the new pipeline runs parallel with the existing North-South Carrier 1 pipeline as is located approx. 15m from the centerline of the existing pipe on the western side. There is currently an existing track following the NSC1 line which will eventually become the new Maintenance Road. Apart from undulating ground conditions in certain areas, access to the new location is fairly unproblematic. The site of the new Moralane BPT is located approx. 30km. in the bush, just before the main surfaced road which runs from the town of Serule to Selebi-Phikwe. Therefore good access is available from both ends of the project.

Client: The Government of Botswana, Ministry of Minerals, Energy & Water Resources.

Work Scope:

Structures

 The Construction of the Moralane Break Pressure Tank (1A2)

  The Construction of the Moralane Pump Station (2.2)

 The Construction of Dikalate Feeder Tank (2A2)

  The Construction of Palapye Break Pressure Tank (2B)

Pipeline

 The Construction of a 1200mm diam. Steel Pipeline from the Moralane Break Pressure Tank at Km. 32,637 to the Palapye Break Pressure Tank at Km. 110,000 – approx. 77.5km. complete with associated Air Valve, Gate Valve and Wash-Out Chambers etc. 

 Ancillary Works

  Regional Telemetry, Communication & SCADA

 Regional Cathodic Protection

 Local Wet Commissioning

 Remote Commissioning

     • Construction of a Maintenance Road 

 Locations and Roles


     • Gaborone Area Office

 Main office in Palapye

 Camp and offices in Selibe Pikwe

 PMV and Stores

 Camp in Palapye:

Camp Facilities: Camp office, recreation, security gate, laundry, and some senior accommodations. All those facilities must have network and internet facilities.

Office Facilities: Secure domain network, daily backups, email and internet facilities, fax and telephony. 


Services Provided 

Telephony 

Setting up IP-PBX to use VoIP  technology among the sites and remote locations wirelessly. Full integration between the on-premise IP-PBX and our cloud PBX to connect the service through our SIP truncks to locations where VPN is not established among the offices.

SIPTruck for international communication

Provided SIP Truncks with teir 1 providers to provide the sites with international calls at very low rate.

Hosted Emails

Provided the project with hosted mail boxes for each user.

Faxes

Setting up fax services

VHF Radios

Setting up VHF/UHF radios  along the right of way (70 KM)

 

Summary Plan (Draft)

BotswanaPlan
 

Detailed Plan (Implementation on site)

Botswana Plan2

Office Setup